Production
Manufacturing: moulding, tooling and decoration under one roof
The structural decision behind this company is simple — moulding and decoration happen on the same site. That is why fit, tolerance and finish can be owned end to end instead of coordinated between suppliers.
The order path
Each step produces something you can check before the next one commits money.
Brief & feasibility
Format, capacity, decoration and volume reviewed for manufacturability.
Quotation
Material, tooling, decoration and lead time stated in writing.
Tooling
New tool built and debugged; existing tools checked against current dimensions.
First-article approval
Physical samples signed off on colour, texture, fit and decoration.
Production
Moulding, decoration and assembly against the approved specification.
Delivery
Packed to your ship format with the agreed documentation.
Plant and capacity
The figures below are the ones we work to. Where a number is a certified figure it carries its certificate number; where it is an operating standard we say so.
| Item | Figure |
|---|---|
| Production floor | 20,000 m² across 2 production bases in Huizhou |
| Injection moulding | 30 machines, including Sino-Japanese joint-venture equipment |
| Vacuum metallizing | 4 lines run to Class 100,000, plus 1 spray line and 1 UV sampling line |
| Clean areas | Injection workshop run to Class 300,000; metallizing hall to Class 100,000 (GB standard, in-house operating standard — no third-party report held) |
| Team | 200+ employees, including a 10+-person mould team; core team in plastics since 2015 |
| Company history | Core team began plastics customisation in Guangzhou in 2015; the Huizhou production entity was established in 2019 (registered 2019-01-29) |
| ISO 9001 | Certificate 02824Q13728R0M — scope: production and sales of plastic packaging containers (licensed items excluded); valid 2024-11-05 to 2027-11-04 |
| IATF 16949 | IATF 0609721 (ZA-FCAV 2601506/R0S) — scope: production of injection-moulded parts (excluding 8.3 product design); valid 2026-07-24 to 2029-07-23 |
The floor, photographed
Moulding, tooling, metallizing, spraying, assembly and dispatch — taken on site, not supplied by an agency.










Moulding and tooling
- Tooling developed in-house. Not bought in per job, which is why repeat orders land consistently and why we can modify an existing tool rather than re-cut it.
- Customer tooling is customer property. Tracked, tagged and not produced for anyone else. Ownership is written into the tooling agreement.
- Pilot runs on production tooling. What you approve is the same tool that runs the production order — no soft-tool or hand-finished substitution.
- Controlled clean areas for skin-contact parts. The cleanliness class of the area your part runs in is stated in the quotation, not assumed.


Decoration and assembly
- Eight decoration processes in-house. UV vacuum metallizing (NCVM and PVD), spray, silk-screen, hot stamping, laser engraving, pad printing, 3D spray painting and assembly — see the decoration page for what each is for.
- Decorating on the moulded part. Coating and print behaviour over a radius differs from a flat wall; doing it on site means we adjust for that rather than discovering it after a supplier ships back.
- Assembly to pack-ready. Components can be assembled so you receive parts ready to fill, not a bag of loose pieces.